Schedule Activities
Directions

Santa Clara Town Center


  Schedule Activities






SANTA CLARA TOWN CENTER (BUDGET) - 75% CONSTRUCTION DOCUMENTS

EL CAMINO REAL & SCOTT BOULEVARD
SANTA CLARA, CA. 95050



-------------------



W. L. BUTLER CONSTRUCTION, INC., IS THE GENERAL CONTRACTOR

FOR THIS PROJECT. THE SCOPE-OF- WORK INCLUDES WARMS SHELLS

FOR THREE (3) SHOPS BUILDINGS (Buildings A, B, C); A MARKET

BUILDING (M-01); FIVE (5) RETAIL BUILDINGS (D-01, D-05, D-07, D-08, D-09).




THE SCOPE-OF-WORK EXCLUDES THE EXISTING SOUTH and WEST

BUILDINGS (REFERENCE SHEET G010) and THE TARGET, and TARGET LOADING BUILDINGS.




THE SITEWORK IS PHASED CONSTRUCTION FOR THE ENTIRE SITE,

EXCEPT FOR PARCELS 2 and 3 AS DELETED IN SHEET (C113). FOR THE

NEW TARGET STORE PROVIDE A BUILDING PAD, INCLUDING THE

LOADING DOCK AREA, PER TARGET STANDARDS. THE TARGET

ADJACENT SITE PAVING BACK OF CURB IS EXCLUDED FROM THE SCOPE-

OF-WORK.



-------------------



BUDGET ARE DUE: TUESDAY, FEBRUARY 26th, 2013 @ 3:00PM


CONTACT: rudy.carrasquilla@wlbutler.com [Estimator] - OR - eddie.tai@wlbutler.com [Project Manager]

PHONE: (650) 361-1270

EST. FAX: (650) 361-854



--------------------



* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *




ADDENDUM






* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *




INDEX of DRAWINGS (75% CONSTRUCTION DOCUMENTS)



COVER SHEET
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: COVER SHEET

[G000] PROJECT INFORMATION
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G000] PROJECT INFORMATION

[G001] DRAWINGS INDEX
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [GOO1] DRAWINGS INDEX

[G002] PROJECT INFORMATION
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G002] PROJECT INFORMATION

[G010] CODE SUMMARY - SITE PLAN
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G010] CODE SUMMARY - SITE PLAN

[G011] EGRESS SUMMARY
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G011] EGRESS SUMMARY

[G012] EGRESS SUMMARY
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G012] EGRESS SUMMARY

[G013] EGRESS SUMMARY - TARGET
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G013] EGRESS SUMMARY - TARGET

[G014] EGRESS SUMMARY
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: EGRESS SUMMARY

[G021] ADA & FIRE TRUCK ACCESS PLAN
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

[G020] FIRE TRUCK ACCESS PLAN
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G020] FIRE TRUCK ACCESS PLAN

[G030] ACCESIBILITY DETAILS
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)
Attached document: [G030] ACCESIBILITY DETAILS





------------------





CIVILS DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

C000 / CIVIL COVER SHEET & GENERAL NOTES
C001 / GENERAL NOTES
C002 / CONSTRUCTION DETAILS
C003 / CONSTRUCTION DETAILS
C004 / CONSTRUCTION DETAILS
C005 / WATER DEPARTMENT DETAILS
C100 / OVERALL SITE CONDITIONS
C101 / BOUNDARY, TOPOGRAPHIC & UTILITY SURVEY
C102 / BOUNDARY, TOPOGRAPHIC & UTILITY SURVEY
C103 / BOUNDARY, TOPOGRAPHIC & UTILITY SURVEY
C111 / DEMOLITION PLAN
C112 DEMOLITION PLAN
C113 / DEMOLITION PLAN
C200 / OVERALL SITE PLAN
C301 / PRELIMINARY GRADING PLAN
C302 / PRELIMINARY GRADING PLAN
C303 / PRELIMINARY GRADING PLAN
C401 / PRELIMINARY SITE UTILITY PLAN
C402 / PRELIMINARY SITE & UTILITY PLAN
C403 / PRELIMINARY SITE & UTILITY PLAN
C404 / SITE UTILITY & TREE OVERLAY PLAN
C500 / STORMWATER CONTROL PLAN
C501 / STORMWATER CONTROL PLAN


Attached document: CIVILS DISCIPLINE





------------------





LANDSCAPE DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

L000 / PLANTING NOTES
L001 / IRRIGATION SITE PLAN
L100 / LANDSCAPE SITE PLAN
L105 / IRRIGATION PLAN
L401 / LANDSCAPE PLAN
L402 / LANDSCAPE PLAN
L403 / LANDSCAPE PLAN
L500 / PLANTING DETAILS
L501 / IRRIGATION DETAILS
L502 / IRRIGATION PLAN
L503 / IRRIGATION SPECIFICATIONS
L504 / IRRIGATION SPECIFICATIONS
L505 / LANDSCAPE DETAILS


Attached document: LANDSCAPE DISCIPLINE





-------------------





FOUNTAIN DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

F001 / FOUNTAIN OVERVIEW PLAN
F002 / PLAN, ELEVATION, MECH. PLAN & PUMP ROOM
F003 / FOUNTAIN LINE DRAWING
F004 / SMALL FOUNTAIN
F005 / SMALL FOUNTAIN
F006 / FOUNTAIN LINE DRAWING
F007 / FOUNTAIN LINE DRAWING


Attached document: FOUNTAIN DISCIPLINE





-------------------





ARCHITECTURAL DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

A100 / SITE PLAN
A102 / ENLARGED SITE PLAN
A103 / ENLARGED SITE PLAN
A104 / ENLARGED SITE PLAN
A105 / ENLARGED SITE PLAN
A130 / FLOOR PLAN
A135 / ROOF PLAN
A140 / FLOOR PLAN
A145 / ROOF PLAN
A150 / FLOOR PLAN
A155 / LOWER ROOF PLAN
A156 / UPPER ROOF PLAN
A160 / FLOOR PLAN
A165 / LOWER ROOF PLAN
A166 / UPPER ROOF PLAN
A230 / ELEVATIONS
A240 / ELEVATIONS
A250 / ELEVATIONS
A251 / ELEVATIONS
A260 / ELEVATIONS
A261 / ELEVATIONS
A300 / SITE SECTIONS
A301 / SITE SECTIONS
A330 / BUILDING SECTIONS
A335 / WALL SECTIONS
A345 / WALL SECTIONS
A350 / BUILDING SECTIONS
A355 / WALL SECTIONS
A356 / WALL SECTIONS
A357 / WALL SECTIONS
A360 / BUILDING SECTIONS
A365 / WALL SECTIONS
A366 / WALL SECTIONS
A400 / ENLARGED TOILET PLAN
A401 / ENLARGED TRASH ENCLOSURE PLAN
A402 / ENLARGED TRASH ENCLOSURE PLAN
A403 / ENLARGED TRASH ENCLOSURE PLAN
A404 / ENLARGED TRASH ENCLOSURE PLAN
A405 / TRASH ENCLOSURE DETAILS
A406 / SITE WALL PLANS, ELEVATIONS & DETAILS
A451 / ENLARGED PLAN & ELEVATION DETAILS
A500 / WALL CONSTRUCTION ASSEMBLIES
A501 / ROOF CONSTRUCTION ASSEMBLIES
A502 / STOREFRONT TILE ISOMETRIC
A515 / BASE DETAILS - NEW BUILDINGS
A520 / DOOR DETAILS
A525 / STOREFRONT & WINDOWS DETAILS
A526 / STOREFRONT & WINDOWS DETAILS
A527 / STOREFRONT & WINDOWS DETAILS
A528 / GATE DETAILS
A530 / CEMENT PLASTER & NICHES DETAILS
A531 / CEMENT PLASTER ENLARGED DETAILS
A540 / ROOF DETAILS
A541 / ROOF DETAILS
A542 / ROOF DETAILS
A543 / ROOF DETAILS
A544 / ROOF DETAILS
A550 / EXTERIOR DETAILS - SEISMIC & EXPANSION JOINTS
A551 / EXTERIOR DETAILS - AWNINGS
A552 / EXTERIOR DETAILS - TRELLIS
A600 DOOR SCHEDULE
A602 / STOREFRONT SHCEDULE
A605 / ORNAMENT SHCEDULE


Attached document: ARCHITECTURAL DISCIPLINE





-----------------





STRUCTURAL DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

S003 / GENERAL STRUCTURAL NOTES
S004 / GENERAL STRUCTURAL NOTES
S005 / GENERAL STRUCTURAL NOTES
S130 / FOUNDATION PLAN
S135 / ROOF FRAMING PLAN
S136 / ROOF DIAGRAM NAILING PLAN
S140 / FOUNDATION PLAN
S145 / ROOF FRAMING PLAN
S150 / FOUNDATION PLAN
S155 / ROOF FRAMING PLAN
S156 / TOWER FRAMING PLAN
S160 / FOUNDATION PLAN
S165 / ROOF FRAMING PLAN
S166 / TOWER FRAMING PLAN
S320 / SECTIONS
S330 / SECTIONS
S332 / SECTIONS
S420 / ELEVATIONS
S5.1 / TYPICAL CONCRETE DETAILS
S5.2 / CONCRETE DETAILS
S6.1 / CMU DETAILS
S6.2 / CMU DETAILS
S7.1 / TYPICAL STEEL DETAILS
S7.2 / STEEL DETAILS
S7.3 / STEEL DETAILS
S7.4 / STEEL DETAILS
S8.1 / TYPICAL WOOD DETAILS
S8.2 / TYPICAL WOOD DETAILS
S8.3 / WOOD DETAILS
S8.4 / WOOD DETAILS
S8.5 / WOOD DETAILS

Attached document: STRUCTURAL DISCIPLINE





------------------





ELECTRICAL DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

E000 / SITE SYMBOLS - FIXTURE SCHEDULE
E030 / SYMBOLS - ONE-LINE DIAGRAM
E031 / FIXTURE SCHEDULE
E050 / SYMBOLS, & FIXTURE SCHEDULE
E051 / ONE-LINE DIAGRAM & PANEL SCHEDULES
E101 / PARTIAL ELECTRICAL SITE PLAN
E103 / PARTIAL ELECTRICAL SITE PLAN
E104 / PARTIAL ELECTRICAL SITE PLAN
E130 / ELECTRICAL PLAN
E140 / ELECTRICAL PLAN
E150 / ELECTRICAL PLAN
E160 / ELECTRICAL PLAN


Attached document: ELECTRICAL DISCIPLINE





------------------





MECHANICAL DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

M010 / MECHANICAL NOTES, LEGEND & SYMBOLS
M130 / MECHANICAL ROOF PLAN
M140 / MECHANICAL ROOF PLAN
M150 / MECHANICAL ROOF PLAN
M160 / MECHANICAL ROOF PLAN
M611 / MECHANICAL SCHEDULE
Attached document: MECHANICAL DISCIPLINE





-------------------





PLUMBING DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

SP130 / PARTIAL PLUMBING SITE PLAN
SP131 PARTIAL PLUMBING SITE PLAN
P010 / PLUMBING NOTES, LEGEND & SYMBOL
P130 PLUMBING FLOOR PLAN
P140 / PLUMBING FLOOR PLAN
P141 / PLUMBING ROOF PLAN
P150 / PLUMBING FLOOR PLAN
P151 / PLUMBING ROOF PLAN
P160 / PLUMBING FLOOR PLAN
P161 / PLUMBING ROOF PLAN


Attached document: PLUMBING DISCIPLINE





--------------------





ARCHITECTURAL LIGHTING DISCIPLINE
75% CONSTRUCTION DOCUMENTS (Dated 02/08/2013)

AL103 / LIGHTING SITE PLAN
AL104 / LIGHTING SITE PLAN
AL230 / ELEVATIONS
AL240 / ELEVATIONS
AL250 / ELEVATIONS
AL260 / ELEVATIONS


Attached document: ARCHITECTURAL LIGHTING DISCIPLINE




* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *




PROJECT MANUAL / SPECIFICATIONS (75% PRICING SUBMITTAL)



PROJECT MANUAL including SPECIFICATIONS

SANTA CLARA TOWN CENTER

EL CAMINO REAL & SCOTT BOULEVARD
SANTA CLARA, CA.

-----------------

75% PRICING SUBMITTAL -(SITE & NEW BUILDINGS)

(Dated February 08, 2013)
KDA ARCHITECTS


Attached document: PROJECT MANUAL including SPECIFICATIONS




* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *




COMPREHENSIVE ASBESTOS & LEAD SURVEY REPORT






ASBESTOES and LEAD SURVEY / GEOTECHNICAL REPORT / PHASE-1 ENVIRONMENTAL

COMPREHENSIVE ASBESTOS & LEAD SURVEY REPORT (Dated AUGUST 25th, 2011)

------------------

GEOTECHNICAL ENGINEERING INVESTIGATION (proposed WALGREENS) (Dated AUGUST 2011)

------------------

PHASE-1 ENVIRONMENTAL ASSESSMENT (VACANT COMMERCIAL PROPETY) (Dated JULY 2011)


Attached document: ASBESTOES and LEAD SURVEY / GEOTECHNICAL REPORT / PHASE-1 ENVIRONMENTAL




* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *









12042 - SANTA CLARA TOWN CENTER (75% CONSTRUCTION DOCUMENTS)